Table 4 Generation schedule with and without renewable energy source unit participation per unit

From: Integrating hydro and wind resources for effective congestion management in a hybrid electricity market

Gen

2L congestion line (15–16) and (14–16) without renewable resource

2L congestion line (15–16) and (14–16) with wind units

2L congestion line (15–16) and (14–16) with hydro units

2L congestion line (15–16) and (14–16) with 1 hydro + 2 wind units

2L congestion line (15–16) and (14–16) with 2 hydro + 1 wind units

Pg

Pgn

\(\Delta {\textrm{P}}_{\textrm{g}}^{\textrm{u}}\)

\(\Delta {\textrm{P}}_{\textrm{g}}^{\textrm{d}}\)

Pgn

\(\Delta {\textrm{P}}_{\textrm{g}}^{\textrm{u}}\)

\(\Delta {\textrm{P}}_{\textrm{g}}^{\textrm{d}}\)

Pgn

\(\Delta {\textrm{P}}_{\textrm{g}}^{\textrm{u}}\)

\(\Delta {\textrm{P}}_{\textrm{g}}^{\textrm{d}}\)

Pgn

\(\Delta {\textrm{P}}_{\textrm{g}}^{\textrm{u}}\)

\(\Delta {\textrm{P}}_{\textrm{g}}^{\textrm{d}}\)

Pgn

\(\Delta {\textrm{P}}_{\textrm{g}}^{\textrm{u}}\)

\(\Delta {\textrm{P}}_{\textrm{g}}^{\textrm{d}}\)

1

1.52

1.52

-

-

1.52

-

-

1.52

  

1.52

  

1.52

  

2

1.52

1.90

0.38

-

1.52

 

-

1.52

  

1.52

  

1.52

  

7

1.5

2.09

0.59

-

1.5

-

-

1.5

  

1.5

  

1.5

  

8*

2.4

2.4

-

-

2.513

0.343

-

2.47

.073

 

2.4

  

2.4

  

13*

2.36

2.36

-

 

3.65

0.40

-

3.16

.80

 

3.75

0.50

 

3.34

0.099

 

15

4.5

3.7

-

0.80

3.7

-

0.80

3.7

 

.80

3.7

 

0.80

3.7

 

0.80

16

1.5

1.55

0.05

-

1.55

0.05

-

1.55

.05

 

1.55

0.05

 

1.55

0.05

 

18*

3.5

3.5

-

-

2.85

-

0.40

3.5

  

2.85

 

0.39

2.7

 

0.80

21

3.0

2.2

-

0.80

2.74

-

0.2595

2.75

 

.2415

2.75

 

0.24

2.91

 

0.085

22

3.1

2.86

-

0.23

3.0

-

0.10

2.41

 

.6824

3.0

 

0.10

3.0

 

0.10

23

3.5

4.3

0.80

-

3.85

0.35

-

4.3

.80

 

3.84

0.342

 

4.25

0.75

 
  1. *represents the number of Hydro units