Skip to main content

Table 3 Generation schedule with and without renewable energy source units participation per unit

From: Integrating hydro and wind resources for effective congestion management in a hybrid electricity market

Gen

3L congestion line (15–16), (14–16), and (6–10) without renewable resource

3L congestion line (15–16), (14–16) and (6–10) with wind units

3L congestion line (15–16), (14–16), and (6–10) with hydro units

3L congestion line (15–16), (14–16), and (6–10) with 1Hydro+2 wind units

3L congestion line (15–16), (14–16), and (6–10) with 2Hydro+1 wind units

Pg

Pgn

\(\Delta {\textrm{P}}_{\textrm{g}}^{\textrm{u}}\)

\(\Delta {\textrm{P}}_{\textrm{g}}^{\textrm{d}}\)

Pgn

\(\Delta {\textrm{P}}_{\textrm{g}}^{\textrm{u}}\)

\(\Delta {\textrm{P}}_{\textrm{g}}^{\textrm{d}}\)

Pgn

\(\Delta {\textrm{P}}_{\textrm{g}}^{\textrm{u}}\)

\(\Delta {\textrm{P}}_{\textrm{g}}^{\textrm{d}}\)

Pgn

\(\Delta {\textrm{P}}_{\textrm{g}}^{\textrm{u}}\)

\(\Delta {\textrm{P}}_{\textrm{g}}^{\textrm{d}}\)

Pgn

\(\Delta {\textrm{P}}_{\textrm{g}}^{\textrm{u}}\)

\(\Delta {\textrm{P}}_{\textrm{g}}^{\textrm{d}}\)

1

1.52

1.52

-

-

1.52

-

-

1.52

.2356

 

1.52

  

1.52

  

2

1.52

1.90

0.38

-

1.52

0.2645

-

1.75

  

1.78

0.2626

 

1.77

0.253

 

7

1.5

2.09

0.59

-

1.5

-

-

1.5

  

1.5

  

1.5

  

8*

2.4

2.4

-

-

2.513

0.2394

-

2.4

  

2.37

 

0.0218

2.4

  

13*

2.36

2.36

-

 

3.65

0.50

-

3.086

.7228

 

3.75

0.50

 

3.43

0.189

 

15

4.5

3.7

-

0.80

3.7

-

0.80

3.70

 

.80

3.7

 

0.80

3.7

 

0.80

16

1.5

1.55

0.05

-

1.55

0.05

-

1.55

.05

 

1.55

0.05

 

1.55

0.05

 

18*

3.5

3.5

-

-

2.85

-

0.50

3.5

  

2.75

 

0.50

2.7

 

0.80

21

3.0

2.2

-

0.80

2.74

-

0.2675

2.448

 

.552

2.73

 

0.26

2.8

 

0.19

22

3.1

2.86

-

0.23

3.0

-

0.10

2.753

 

.3468

3.0

 

0.10

3.0

 

0.10

23

3.5

4.3

0.80

-

3.85

0.1855

-

4.19

.6904

 

3.70

0.2092

 

3.99

0.4961

 
  1. *represents the number of Hydro units