Skip to main content

Table 7 Scanner measurement of the center coordinates of the chord pipe at the end of the joint

From: Evaluation of new target structure and recognition for point cloud registration and coordinates transformation of China’s large double-span bridge

Parts

Mileage

x (m)

y (m)

z (m)

\(r\)(mm)

2# Lower left-hand string

Little

96,050.1064

4.9848

576.6385

701.7

Large

96,050.8838

4.9944

576.6166

689.2

2# Lower right-hand string

Little

96,050.1054

12.4932

576.6435

701.7

Large

96,050.8829

12.5005

576.6244

689.2

2# Higher right-hand string

Little

96,050.1082

12.4902

583.1681

701.7

Large

96,050.8845

12.4959

583.1468

689.2

1# Lower left-hand string

Little

95,645.1144

4.9945

576.6263

700.4

Large

95,645.8835

4.9987

576.6305

691.5

1# Lower right-hand string

Little

95,645.1162

12.4979

576.6329

711.6

Large

95,645.8814

12.5015

576.6453

698.4

1# Higher right-hand string

Little

95,645.1110

12.4962

583.1582

706.4

Large

95,645.8921

12.4996

583.1672

696.4