Skip to main content

Table 3 Normalised experimental data

From: A fuzzy TOPSIS method for surface integrity criteria ranking using the wire electrical discharge machining process

 

Non-beneficial = (minimum \({X}_{ij}\))/ \({X}_{ij}\); beneficial = \({X}_{ij}\)/ (maximum \({X}_{ij}\))

Output parameter

Beneficial

Non-beneficial

Non-beneficial

Non-beneficial

Non-beneficial

CR

Rz

Rt

SCD

RLT

Run order

1

0.921

0.877

0.939

0.858

0.912

2

0.960

0.799

0.879

0.561

0.706

3

0.941

0.846

0.918

0.747

0.847

4

0.895

0.867

0.939

0.839

0.932

5

0.578

1.000

1.000

0.991

0.963

6

0.937

0.847

0.931

0.788

0.885

7

0.844

0.888

0.946

0.898

0.936

8

0.948

0.819

0.898

0.642

0.778

9

1.000

0.841

0.866

0.513

0.675

10

0.945

0.829

0.903

0.680

0.801

11

0.619

0.941

0.997

1.000

1.000

12

0.684

0.934

0.991

0.991

0.993

13

0.747

0.909

0.982

0.950

0.985

14

0.904

0.867

0.938

0.846

0.925

15

0.824

0.899

0.954

0.913

0.957