Skip to main content

Table 8 A comparison between the performance of the major reliability evaluation groups

From: A comparative study between the system reliability evaluation methods: case study of mining dump trucks

Criteria

Non-parametric method

Parametric method

Semi-parametric method

Method Scope and Completeness

Implementing a multi-step approach for the desired outcomes

Implementing a multi-step approach for the desired outcomes

Implementing a one-step approach for the desired outcomes

Data Availability and Abundance

Employing a partial dataset for each step

Employing a partial dataset for each step

Employing full dataset simultaneously

Variable Categorization

Failure-related variables

Failure-related variables

Failure-related and non-failure-related variables

Uncertainty Quantification

0.28

0.11

0.15

Extrapolation Capability and Predictive Power

Null

Extrapolation beyond the data range

Extrapolation beyond the data range