Skip to main content

Table 5 Estimating system reliability at various times using the parametric method

From: A comparative study between the system reliability evaluation methods: case study of mining dump trucks

Time

Reliability function

Uncertainty

Time

Reliability function

Uncertainty

Lower bound

Upper bound

Lower bound

Upper bound

0

1

10−6

1

125

0.083

0.047

0.136

5

0.997

0.990

0.999

130

0.075

0.042

0.126

10

0.971

0.940

0.987

135

0.069

0.037

0.117

15

0.914

0.860

0.951

140

0.063

0.033

0.109

20

0.840

0.771

0.893

145

0.057

0.030

0.102

25

0.759

0.683

0.825

150

0.052

0.026

0.095

30

0.680

0.599

0.753

155

0.048

0.024

0.089

35

0.605

0.524

0.683

160

0.044

0.021

0.083

40

0.537

0.456

0.617

165

0.040

0.019

0.078

45

0.476

0.396

0.558

170

0.037

0.017

0.073

50

0.422

0.344

0.504

175

0.034

0.015

0.068

55

0.375

0.298

0.456

180

0.031

0.014

0.064

60

0.333

0.259

0.413

185

0.029

0.013

0.060

65

0.296

0.225

0.375

190

0.027

0.011

0.057

70

0.263

0.196

0.341

195

0.025

0.010

0.053

75

0.235

0.170

0.311

200

0.023

0.009

0.050

80

0.210

0.149

0.284

205

0.021

0.008

0.048

85

0.188

0.130

0.260

210

0.020

0.008

0.045

90

0.169

0.114

0.238

215

0.018

0.007

0.042

95

0.152

0.100

0.219

220

0.017

0.006

0.040

100

0.136

0.088

0.201

225

0.016

0.006

0.038

105

0.123

0.077

0.185

230

0.015

0.005

0.036

110

0.111

0.068

0.171

235

0.014

0.005

0.034

115

0.101

0.060

0.158

240

0.013

0.004

0.032

120

0.091

0.053

0.147

   Â