Skip to main content

Table 1 The results of the fuzzy triangular numbers

From: The use of fuzzy linear regression for the selection of the most appropriate fuzzy implication in a fly ash-based concrete model

 

First case

Second case

Variable

Estimate \({\mathbf{R}}_{\mathbf{i}}\)

Estimate \({\mathbf{C}}_{\mathbf{i}}\)

Estimate \({\mathbf{R}}_{\mathbf{i}}\)

Estimate \({\mathbf{C}}_{\mathbf{i}}\)

\({A}_{0}\)

54.535

41.992

196.500

176.505

\({A}_{1}\)

 − 0.085

0.000

 − 0.001

0.000