Table 2 Parameters and indicators identified for bringing CE in building life cycle stages

From: Identification of parameters and indicators for implementing circularity in the construction industry

Parameters

Indicators

References

Predesign/ Design Stage

• Modular/Prefabricated Buildings

• Adaptive Reuse

• Building Material/Components Stock at their end of life

• CE inclusion in Tenders

• Use of BIM Tools

• Environmental Product Declaration

• Design out Waste

• Simple Open Planning

• Designing in Layers

• CE Consultant

• Green Design Methods

• Design for Ease of Maintenance & Repair

[3,4,5, 7, 16,17,18, 21, 23,24,25,26,27,28,29,30,31,32,33, 37, 41,42,43,44, 46, 49,50,51,52,53,54,55,56]

Manufacturing Stage

• Durability/Longevity

• Design for Remanufacture

• Circular Supply Chain

• GHG Emissions

• Efficient use of water resources

• Use of Renewable Energy Sources

• Circular Labels by Professional Bodies

• Reversible Connections

• Repeated Structural Grid with regular dimensions

• Developed Transport Systems

• Matching of Supply and Demand of Reused/Recycled Materials

• Dematerialization

• Innovative Production Process

• Design Networks

• Green building Procurement

• Less use of Packaging

[3,4,5,6, 11, 17,18,19, 26, 27, 29,30,31,32,33, 39, 40, 44, 48,49,50, 57,58,59,60,61,62]

Construction Stage

• Reuse of materials in new construction

• Building Construction Methods

• Smart Construction Technique

• Circular Procurement of Materials & Components

• Use of skilled local workforce

• Fixing and Material Technology as per CE

• Use of Nuts and Bolts

• Mobile Partition Walls

• Use of isolated or Pile Foundation

• Green Construction work

• Increase in performance of building materials

• Offsite construction

• Lean Construction

• Optimization of Components

• Safe storage of construction materials at site

[3, 5, 6, 11, 17, 19, 20, 25, 26, 28, 31, 32, 39, 40, 44, 46, 47, 49,50,51, 60, 63,64,65,66,67,68,69]

Operation/Use Stage

• State of building materials during use and EoL

• Use and modalities for operation in line with CE principles

• Energy Consumption

• Preventive Maintenance

• Healthy and Comfortable Spaces

[3, 6, 17, 26, 31, 49, 70]

End of Life (EoL) Stage

• Design for Demolition

• Selective Deconstruction

• Reuse Potential

• Recycling Potential

• Adaptive Reuse Potential

• Building Restoration

• Pre demolition Audit

• Demolition Plan

• Inventory of Building materials and elements for reuse

• Presence of a Local Recycling Centre

• Deconstruction Labor Speed

• Technologies for enhancing the quality of salvaged materials

• Recycling Network

• Advanced Recycling Technologies

• On-site Waste Management

• Recycling Rates & Targets

• Circularity Score

• Time for Disassembly

• Recycled Product Demand

[3, 5, 6, 10, 16, 17, 19, 20, 23,24,25,26,27, 31, 32, 35, 38, 40, 41, 44, 45, 48, 49, 52, 56, 61, 63, 66, 67, 69, 71,72,73,74,75,76,77,78,79,80]