Table 7 FEMA-P58 basic data for all models

From: Effect of alternative load path design method on preventing progressive collapse and reducing the rehabilitation cost using FEMA-P58

Item

Unit

6th Floors

9th Floors

12th Floors

15th Floors

Floor Area

m2

384

384

384

384

Building Area

m2

2304

3456

4608

5760

Total Replacement Cost (Case A)

$

6,200,012

9,300,019

12,400,025

15,500,031

Total Replacement Cost (Case B)

$

6,398,413

9,597,619

12,796,826

15,996,032

C&S* Replacement Cost (Case A)

$

2,480,005

3,720,007

4,960,010

6,200,012

C&S* Replacement Cost (Case B)

$

2,678,405

4,017,608

5,356,811

6,696,013

Replacement Time

Days

158

237

316

395

Carbon Emissions Replacement

kg

2,916,824

4,375,236

5,833,648

7,292,060.03

Embodied Energy Replacement

MJ

40,363,490

60,545,235

80,726,979.5

100,908,724.4

  1. * Replacement cost, time, carbon and embodied energy are calculated based on FEMA-P58 Vol.(2)
  2. * C&S indication to Core and Shell