Table 19 FEMA-P58 estimated repair time for all models

From: Effect of alternative load path design method on preventing progressive collapse and reducing the rehabilitation cost using FEMA-P58

Intensity Type

No. of Floors

Repair Time ( Days)

Case (A)

Case (B)

Int

Ext

Cor

Int

Ext

Cor

Intensity (1)

6th

0.4

0.4

0.6

0.3

0.2

0.2

9th

0.4

0.4

0.4

0.2

0.2

0.2

12th

0.7

0.7

0.7

0.3

0.3

0.3

15th

1

1

1

0.5

0.5

0.5

Intensity (2)

6th

158

158

158

158

158

158

9th

11.8

14.2

15.1

8.4

9.4

11.8

12th

20.6

17.9

12.6

16.8

16.4

18

15th

18.8

37.2

16.7

28.7

17.6

31.3