Skip to main content

Table 18 FEMA-P58 estimated total repair cost for all models

From: Effect of alternative load path design method on preventing progressive collapse and reducing the rehabilitation cost using FEMA-P58

Intensity Type

No. of Floors

Repair Cost ( $)

Case (A)

Case (B)

Int

Ext

Cor

Int

Ext

Cor

Intensity (1)

6th

21,102

21,315

29,780

15,620

8938

8938

9th

17,911

19,637

19,822

6681

7129

8396

12th

33,923

33,210

33,974

15,347

15,560

16,114

15th

46,253

46,133

46,693

25,493

25,166

24,540

Intensity (2)

6th

6,200,012

6,200,012

6,200,012

6,200,012

6,200,012

6,200,012

9th

679,729

819,062

874,935

500,496

480,346

642,243

12th

1,058,729

914,651

634,093

860,218

844,220

943,981

15th

993,827

1,804,120

890,185

1,307,107

874,407

1,552,845