From: Structural system yielding minimum differences between ordinary and staged analyses
Activity | Time duration (Day) |
---|---|
Construction cycle | 7 |
Form-work installation | 1 |
Casting of each floor | 2 |
Removal of shoring from lowest level and casting of top floor | 5 |
Member age in each floor | 19 |