Skip to main content

Table 1 Materials design mix

From: Optimization of plastic waste integration in cement bricks

Mixtures

Cement (kg/m3)

Sand (kg/m3)

Coarse aggregates (kg/m3)

Plastic (kg/m3)

Water (ml/m3)

Control

250

750

1250

0

125

CEPET 2.5%

244

750

1250

2.79

122

CEPET 5%

237

750

1250

5.7

118.5

CEPET 7.5%

231

750

1250

8.25

115.5

CEPET 10%

225

750

1250

11.12

112.5

CEPET 20%

200

750

1250

22.26

100

CEPE 2.5

244

750

1250

1.96

122

CEPE 5%

237

750

1250

3.9

118.5

CEPE 7.5%

231

750

1250

5.86

115.5

CEPE 10%

225

750

1250

7.8

112.5

CEPE 20%

200

750

1250

15.6

100

CAPE 2.5%

250

750

1218

11.66

125

CAPE 5%

250

750

1187

23.31

125

CAPE 7.5%

250

750

1156

34.97

125

CAPE 10%

250

750

1125

46.6

125

CAPE 20%

250

750

1000

93

125

SAPE 2.5%

250

731

1250

7.13

125

SAPE 5%

250

713

1250

14.25

125

SAPE 7.5%

250

693

1250

21.38

125

SAPE 10%

250

675

1250

28.5

125

SAPE 20%

250

600

1250

57

125