Table 14 Sets of costs for materials [18]

From: A review of optimization techniques and algorithms used for FRP applications in civil engineering

 

CASE A

CASE B

CASE C

 

Concrete

100

100

100

 

Shuttering

25

2.95

35

 

Size

Diameter φb(mm)

f’fu(MPa)

  

#2

6.35

825

0.498361392

0.58630752

0.274098766

COSTS

#3

9.53

760

1.099572057

0.514049937

0.76970044

#4

12.70

690

1.543445568

1.815818315

0.848895062

#5

15.88

655

2.328630417

2.739565196

1.280746729

#6

19.05

620

3.285252527

3.285252527

1.80688889

#7

22.23

586

4.419347369

5.199232198

2.430641053

#8

25.40

550

5.72378227

6.733861494

3.148080249

#9

28.65

517

7.241397324

8.519290969

3.982768528