From: Experimental and numerical analysis of rainfall-induced slope failure of railway embankment of semi high-speed trains
S.No
Depth of gully before scaling up(cm)
Depth of gully after scaling up (m)
1
2
0.5
4
1.01
3
5.5
1.39
6
1.52
5
7
1.773
12
3.04
15
3.8
8
19
4.81