Skip to main content

Table 12 Experimental design plan and responses for example 2 [12]

From: SWARA-CoCoSo method-based parametric optimization of green dry milling processes

Exp. no.

V (rev/min)

f (mm/min)

a (mm)

w (mm)

MRR (mm3/min)

Ra (μm)

ACE (kJ)

1

1200

220

0.3

5

330

3.30

535.802

2

1200

220

0.4

10

880

2.95

184.929

3

1200

220

0.5

15

1650

1.41

88.519

4

1200

270

0.3

5

405

3.83

426.109

5

1200

270

0.4

10

1080

3.87

146.050

6

1200

270

0.5

15

2025

1.68

69.823

7

1200

320

0.3

5

480

3.97

361.832

8

1200

320

0.4

10

1280

3.53

122.976

9

1200

320

0.5

15

2400

2.29

53.988

10

1700

220

0.3

10

660

1.81

337.042

11

1700

220

0.4

15

1320

1.13

142.727

12

1700

220

0.5

5

550

3.47

299.031

13

1700

270

0.3

10

810

2.85

269.604

14

1700

270

0.4

15

1620

1.41

113.648

15

1700

270

0.5

5

675

3.91

238.476

16

1700

320

0.3

10

960

2.55

213.559

17

1700

320

0.4

15

1920

1.39

92.551

18

1700

320

0.5

5

800

4.12

193.109

19

2200

220

0.3

15

990

1.76

244.303

20

2200

220

0.4

5

440

3.33

425.797

21

2200

220

0.5

10

1100

2.36

165.620

22

2200

270

0.3

15

1215

1.17

193.939

23

2200

270

0.4

5

540

3.72

338.579

24

2200

270

0.5

10

1350

2.58

131.343

25

2200

320

0.3

15

1440

1.41

160.886

26

2200

320

0.4

5

640

3.86

286.850

27

2200

320

0.5

10

1600

2.76

108.147