Table 13 The criteria/station costs and the available costs

From: Supporting a decision for metro station restoration based on facility assessment: application to Cairo metro stations

Criteria

Wt. vector

Ataba

Sadat

Helwan

Tora El-Asmant

Thakanat El-Maadi

El-Malek El-Saleh

Criteria total cost

Available cost

Structure

0.315

10

2

8

4

4

3.5

33

30.5

Arch

0.173

6

4

6.5

4

3

2.5

27

23.25

Hydro mechanic

0.162

4

1

3

3.5

3

2.5

18.25

16.75

Elect/comm

0.138

3

1

2

1

2

2

12.25

11

Safety

0.115

4

1.5

1

1.5

2

1.5

12.1

11.5

Passage usage facilities

0.097

3

2.5

3

2

1.5

2

15

13

Station total cost

1

30

12

23.5

16

15.5

14

117.6

 

Available cost

 

27

10.25

21

15

14.25

12.5

106

106