Criteria | Wt. vector | Ataba | Sadat | Helwan | Tora El-Asmant | Thakanat El-Maadi | El-Malek El-Saleh | Criteria total cost | Available cost |
---|---|---|---|---|---|---|---|---|---|
Structure | 0.315 | 10 | 2 | 8 | 4 | 4 | 3.5 | 33 | 30.5 |
Arch | 0.173 | 6 | 4 | 6.5 | 4 | 3 | 2.5 | 27 | 23.25 |
Hydro mechanic | 0.162 | 4 | 1 | 3 | 3.5 | 3 | 2.5 | 18.25 | 16.75 |
Elect/comm | 0.138 | 3 | 1 | 2 | 1 | 2 | 2 | 12.25 | 11 |
Safety | 0.115 | 4 | 1.5 | 1 | 1.5 | 2 | 1.5 | 12.1 | 11.5 |
Passage usage facilities | 0.097 | 3 | 2.5 | 3 | 2 | 1.5 | 2 | 15 | 13 |
Station total cost | 1 | 30 | 12 | 23.5 | 16 | 15.5 | 14 | 117.6 | Â |
Available cost | Â | 27 | 10.25 | 21 | 15 | 14.25 | 12.5 | 106 | 106 |