Skip to main content

Table 3 UCS threshold of cement-stabilised soil as road material according to various standards

From: Evaluation of cement stabilised residual soil on macro- and micro-scale for road construction

No

Type of structure

Parameter

Standard

Reference

1

Sub-base coarse

7-day UCS (0.75–1.5 MPa)

India

[85]

2

Low traffic volume road

7-day UCS (0.8 MPa)

Malaysia

[86]

3

Road base

7-day UCS (>1.8 MPa)

France

[45]

3a

Road sub-base

7-day UCS (>1.2 MPa)

4

Medium-high traffic volume road

7-day UCS (2.068–5.516 MPa)

Portland Cement Association (PCA)

[87]

5

Subbase and subgrade

7-day UCS (1.72 MPa)

AASHTO

[88]

5a

Base

7-day UCS (5.17 MPa)

6

Base in cold regions

UCS (4.1 MPa)

Federal Highway Administration (FHWA)

[89]

6a

Subgrade

7-day UCS (1.4 MPa)

7

Bound pavement materials

28-day curing and 4 h submerging into water before testing UCS (2 MPa)

The stabilisers must be >3%

Australia

[90]

8

High-speed railway roadbed

5% Cement was proved to be adequate to control frost-heaving

China

[91]