Skip to main content

Table 3 General specifications of the projects analyzed

From: Evaluation of influential value engineering factors on the function of interchanges: case studies in Iran

Interchange name

Project location

Base total cost (IRR)*

VE project cost (IRR)*

Project’s consulting firm

VE consulting firm

Simon Bolivar-Yadegar-e-Emam

Tehran

3,445,590,000,000

2,155,609,000,000

Ardam

Imen Taghatoe

Chamran-Jalal Al-e-Ahmad

Tehran

614,377,000,000

352,460,000,000

Rahan Sazeh

Imen Taghatoe & Rahab

Shahed-jadeh ghouchan

Mashhad

245,502,000,000

148,084,760,000

Rah Avar

Tarh Rah-e-Abrisham

Rezvan-koneh bist

Mashhad

346,000,000,000

135,000,000,000

Abadgaran-e-shargh

Tarh Rah-e-Abrisham

Khawrazmi

Karaj

186,612,437,500

120,859,360,000

Arces pol & Behin taradod-e-pars

Tarh Rah-e-Abrisham & Rahab

Sepah Square

Karaj

375,383,589,610

202,194,986,465

Metra

Rahab

Jomhouri Square

Karaj

72,225,429,629

33,802,131,792

Etehad Rah

Rahab

Rezvan-rahmat

Shiraz

256,300,000,000

138,700,000,000

Gueno

Behin Taradod-e-Pars

  1. *In the year of the research (2017), each Iranian rial (IRR) was equal to $0.00003