Integer variable | h.m/sadat | h.m/helwan | h.m/tora elasmant | h.m/thakanat el maadi | h.m/el-malek el-saleh | Sum |
---|---|---|---|---|---|---|
Cost | 1 | 3 | 3.5 | 3 | 2.5 | 13.00 |
Integer value | 1 | 1 | 1 | 0 | 1 | 10 M LE |
Obtainable budget 10 M LE |  | |||||
The rest of this example is 3 million to be added to the prior criteria in LP/IP programing | ||||||
MAX 3 h.m/sadat+ 2.5 h.m/helwan + 5 h.m/tora + 1.5 h.m/thakanat + 1 h.m/el m. saleh | ||||||
3 h.m/sadat+ 2.5 h.m/helwan + 5 h.m/tora + 1.5 h.m/thakanat + 1 h.m/el m. saleh ≤ 10.00 | ||||||
3 h.m/sadat+ 2.5 h.m/helwan ≥ 0 | ||||||
3 h.m/sadat+ 2.5 h.m/helwan + 5 h.m/tora ≥ 0 | ||||||
3 h.m/sadat+ 2.5 h.m/helwan + 5 h.m/tora + 1.5 h.m/thakanat ≥ 0 | ||||||
3 h.m/sadat+ 2.5 h.m/helwan + 5 h.m/tora + 1.5 h.m/thakanat + 1 h.m/el m. saleh ≥ 0 |